GENERAL INFORMATION

Client : Turkish Telecom Inc.

Location of Construction : ANKARA
Contract Date : 19.04.1983
Completion Date : 25.11.1988
Contract Value : 9.538.125 US $

CHARACTERISTIC FEATURES

Sections in the Building :

A- Main Building : (17 Blocks connected each other by the expansion joints.)

1-Offices
2-PTT branch
3-Mail distribution-coming mail distribution express
4-Parcel-for going and distribution of coming
5-Customs-Airmail coming and foreign country registered & precious letter.
6-Telegraph manager
7-Workshop and Repair-shops
8-Canteen
9-Dining & Meeting hall
10-Outpatient clinic-infirmary
11-Guesthouse
12-Apartment (8 flats)
13-Creche
14-Washing - Greasing Service
15-Closed - Car park
16-Technical services
- Heating Center
- Air Conditioning
- Transformer-station and generator etc.

B- Landscaping :

1-800 tons of R.C. water storage
2-Fuel tanks belong to heating center (2x50 tons) R.C. chamber
3-Fuel tanks belong to generators (15 ton)R.C. chamber
4-200 tons of septic tank
5-Open car parks and pedestrian ways
6-125 mt. length of sewer treatment valley
7-Reliance walls (From 0-2 mt. to 0-7 mt. height 713,10 mt. length)
8-Children play areas and landscaping

Some Productions & Amounts :

Various excavations : 193.252.397 m3
Various dose with reinforced and plain concrete : 27.485.333 m3
Blockage spread with mine stone : 1.302.690 m3
Sand pebble filling productions : 21.842.694 m3
Plain R.C. mold : 79.468.20 m2
Bare concrete R.C. mold : 38.468.97 m2
Reinforcing steel ST I : 1.083.235 ton
Reinforcing steel ST II : 695.894 ton
 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com