GENERAL INFORMATION
Client : Bakırköy Municipality
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
12.08.1985 |
Completion Date |
: |
30.10.1987 |
Contract Value |
: |
14.828.675 US $ |
CHARACTERISTIC FEATURES
Technical Information About the Construction
The construction is based on 3 contracts. The infrastructure
elements (feed water, sewage, telephone, electricity)
situated under the İstasyon and Ebuziyya streets where
the underground shopping center is constructed, have
been displaced on the sink shaft typed retaining walls
within the illuminated galleries in which one can easily
can walk.
The excavation has been made on the construction side;
the construction works of the carcase and 16 m long
cast in-situ concrete beam and the flooring have been
completed; the upper side of the underground shopping
center has been put into service, after having completed
the covering of the superior pedestrian precinct and
the related landscape studies; the laying of the reinforced
concrete on the ground of the shopping center has been
completed after having made the underground excavation
at the closed area; and then the underground shopping
center has been put into service after having completed
the precision works, mechanic and electrical constructions.
There are 92 shops with varying sizes of 15-42 m2
(the total area of the shops : 1700 m2).
The total area of the shopping center is 2.800 m2.
All kinds of technical and social possibilities exist
in the center, and the circulation is provided through
9 staircases. Furthermore, escalators are used nearby
the staircases at the entrance and end of the shopping
center. The technical requirements (mechanic and electricity)
of the underground center are provided through the devices
placed at the basement floors of the business center.
The cooling of the center is made through 4 water coolant
groups with a capacity of 280.000 kcal/h, and the heating
through 3 central heating boilers with a capacity of
720.000 kcal/h. In the premise fire resistant silicon
electric cables have been used; the facility to intervene
and use have been granted by installing electricity
shafts between the two shops.
|