GENERAL INFORMATION
Client : Ministry of Defense
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
08.08.1975 |
Completion Date |
: |
01.10.1978 |
Contract Value |
: |
3.708.630 US $ |
CHARACTERISTIC FEATURES
The construction is established by 2 no. of contracts.
The center with a construction area of 11.000 m2,
consists of 2 units. The 1st unit is designed to provide
all necessary services for the 2.000 students at high-school
level. The unit consists of lecture-halls, mess-hall,
kitchen, cafeteria, library, game room and administration
departments. The 2nd unit consists of dormitory, bathing
and laundry units for 700 students.
Main Work Items:
Construction Area |
: |
11.000 m2 |
Excavation |
: |
60.000 m3 |
Concrete |
: |
8.500 m3 |
Reinforcing Steel |
: |
1.300 tons |
Steel Framing |
: |
2.000 m2 |
Aluminum Framing |
: |
3.800 m2 |
|