GENERAL INFORMATION
Owner |
: |
Kayalar |
Location of Facility |
: |
Çumra/KONYA |
CHARACTERISTIC FEATURES
|
|
Closed
Area
(m2) |
Tanzimi
yapılan
open area
(m2)
|
A) Canalet Factory
Capacity = 80 piece/day x 5 m/piece = 400 m/day
Canalette Manufacturing Section |
: |
3440.00 |
0.00 |
Wire Drawing Mill +Electricity House
+ Warehouse |
: |
375.44 |
0.00 |
Laboratory + Control Office |
: |
300.30 |
0.00 |
Saddle Footing Field Control Office |
: |
16.40 |
0.00 |
Prefabricated Culvert Casting Field |
: |
0.00 |
1330.52 |
Saddle Footing Casting Field |
: |
0.00 |
2984.00 |
Canalette Stock Field |
: |
0.00 |
17400.00 |
Saddle Footing Stock Field |
: |
0.00 |
15000.00 |
Canalette DINLENDIRME HAVUZU |
: |
0.00 |
3480.00 |
B) Washing Sieving Premise (50 m3/hour)
Sieving Premise |
: |
8.84 |
1036.00 |
Water Tank |
: |
0.00 |
365.30 |
Pump Stations-Hydrophore Premise |
: |
98.25 |
0.00 |
Settling Basin |
: |
0.00 |
280.50 |
C) Concrete Plants
Concrete Plant on the
Land number 1 (50 m3/hour) |
: |
4.27 |
350.60 |
Concrete Plant on the
Land number 2 (100 m3/hour) |
: |
16.00 |
1817.00 |
D) Concrete Pipe Factory
(25 piece/day x 2 m/piece=50 m/day) |
: |
375.44 |
0.00 |
E) Workshop Premises
Repair Shop + Electricity House |
: |
486.00 |
0.00 |
Lathe Shop +LASTIKHANE |
: |
137.70 |
0.00 |
Spare Parts Warehouse |
: |
168.75 |
0.00 |
Materials Warehouse |
: |
212.75 |
0.00 |
Boiler Room of the Central Heating
System |
: |
61.80 |
0.00 |
Office of the Workshop Chief |
: |
21.40 |
0.00 |
Parking Area |
: |
0.00 |
2160.00 |
F) Administrative Premises
Administrative Building |
: |
422.26 |
0.00 |
Control Building |
: |
131.05 |
0.00 |
Administrative Dormitories and their
social premises |
: |
444.44 |
0.00 |
Dormitories of the Workers and their
social premises |
: |
908.73 |
0.00 |
Kitchen and the Dining Hall |
: |
577.50 |
0.00 |
Weigthing Yard - Filling Station |
: |
12.40 |
120.00 |
Watchman’s Boot and Parking Lot at
the Entrance |
: |
16.50 |
92.50 |
TOTAL
|
: |
8236.22 |
46417.22 |
There exist two transformer houses of 400 KVA for energy
procurement. Drinking and useable water is provided
through electro pumping from drilling wells.
|