GENERAL INFORMATION
Client : General Directorate of Stake Hydraulic
Works
Location of Construction |
: |
KARAMAN |
Contract Date |
: |
28.12.1990 |
Completion Date |
: |
15.12.1999 |
Contract Value |
: |
62.943.657 US $ |
CHARACTERISTIC FEATURES
a) Roads :
Excavation and Filling |
: |
698.645 m3 |
Structures (R.C.Stel and Concrete) |
: |
500 tons-m3 |
b) Conduit
Excavation |
: |
56.000
m3 |
R.C. Concrete |
: |
9.341 m3 |
R.C. Steel |
: |
739 tons |
Cement |
: |
10.642 tons |
c) Dam Brody
Scrape Excavation |
: |
180.000 m3 |
Foundation Excavation (Cut_Off) |
: |
308.136 m3 |
Filling, Clay |
: |
2.288.217 m3 |
Filling Filter |
: |
180.183 m3 |
Rip rap |
|
70.148 m3 |
d) Injection Works
Injection |
: |
88.504 mt |
Cement |
: |
98.000 tons |
e) Spillway
Excavation and Filling |
: |
132.000 m3 |
R.C. Concrete |
: |
56.500 m3 |
R.C. Steel |
: |
250 tons |
Cement |
: |
17.000 tons |
f) Lake Imorovement
Scrape Excavation |
: |
724.130 m3 |
Filling Clay |
: |
2.004.742 m3 |
Filling Filter |
: |
581.118 m3 |
Rip Ray |
: |
598.540 m3 |
Concrete |
: |
2.438 m3 |
|