GENERAL INFORMATION

Client : General Directorate of Stake Hydraulic Works

Location of Construction : KARAMAN
Contract Date : 28.12.1990
Completion Date : 15.12.1999
Contract Value : 62.943.657 US $

CHARACTERISTIC FEATURES

a) Roads :

Excavation and Filling : 698.645 m3
Structures (R.C.Stel and Concrete) : 500 tons-m3

b) Conduit

Excavation : 56.000 m3
R.C. Concrete : 9.341 m3
R.C. Steel : 739 tons
Cement : 10.642 tons

c) Dam Brody

Scrape Excavation : 180.000 m3
Foundation Excavation (Cut_Off) : 308.136 m3
Filling, Clay : 2.288.217 m3
Filling Filter : 180.183 m3
Rip rap   70.148 m3

d) Injection Works

Injection : 88.504 mt
Cement : 98.000 tons

e) Spillway

Excavation and Filling : 132.000 m3
R.C. Concrete : 56.500 m3
R.C. Steel : 250 tons
Cement : 17.000 tons

f) Lake Imorovement

Scrape Excavation : 724.130 m3
Filling Clay : 2.004.742 m3
Filling Filter : 581.118 m3
Rip Ray : 598.540 m3
Concrete : 2.438 m3
 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com