GENERAL INFORMATION

Client : Ministry of Defence

Location of Construction : İSTANBUL
Contract Date : 17.08.1978
Completion Date : 24.12.1983
Contract Value : 16.407.470 US $

CHARACTERISTIC FEATURES

The construction is established 4 no. of contracts.
This Industrial Complex consists of a factory building located on a 22.000 m2 construction area with 3.500 personnel capacity equipped with a 2x800 KWA automatic generator, a social building with a construction area of 10.000 m2 to meet all needs of the personnel and a nursery with 750 m2 construction area for children of 0-6 years of age.
The steel structure factory has a clear height of 9 mt and is located above the ground floor of the reinforced concrete structure building. The illumination of the factory is provided by means of a Bus-Bar system.

Main Items of Work :

Excavation : 200.000 m3
Concrete : 35.000 m3
Reinforcing Steel : 3.500 tons
Structural Steel : 2.500 tons
ExposedConcreteFormwork : 7.000 m2
Concrete Paving andPeripheral Road : 14.000 m2
Sandwich Plated Rooting : 18.200 m2
Aluminum Framing : 3.000 m2
Steel Framing : 5.000 m2
Illuminated Area : 390.625 m2
Bus-Bar System : 9.000 m length
Waterproofing : 20.000 m2

 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com