GENERAL INFORMATION

Client : İstanbul Greater City Municipality

Location of Construction : İstanbul
Contract Date : 14.07.1992
Completion Date : 19.11.1993
Contract Value : 4.437.622 US $

CHARACTERISTIC FEATURES

The below mentioned constructions are included in this project. Water tank with a capacity of 800 tonnes, tea houses, amphitheatre, open parking lot for 2000 vehicles, sand table, toilettes, enrockment with 2-6 tonnes of stones (31.767 tonnes), arrangement works of the green area of 160.000 m2, kronman wall aside of the enrockment, shore line covered with 5 cm bush-hammered mosaic on 20 cm straw steeled concrete, PVC pipes of 16 ATU, automatic irrigation system by pop-up springs, decorative illumination system (low and high illumination), 2 decorative and performance pools, stroll ways and recreational areas.

Main Constructions

Excavation : 26.140 m3
MachineCompacted Filling : 235.000 m3
Sand-Gravel Filling : 7.158 m3
Concrete : 10.780 m3
Concrete Canal Laying : 914 m
Reinforced Concrete Iron : 166 ton
Straw Steel : 151 ton
2-6 tonnes of Enrockment : 31.767 ton
Stabilized Filling : 31.041 m3
Vegetal Soil : 30.646 m3
Bevel Filling : 72.000 m3
5 cm Bush-hammered Mosaic Pavement : 26.763 m2
Geotextile : 24.212 m2
Cable Canal : 11.145 m
Prefabricated Weir : 1.164 m
16 Atü PVC pipes : 16.099 m
Miscellaneous trees, vegetation etc. : 14.750 number

The total construction area is 16.000 m2 , 90.000 m2 of which is hard ground construction of 1 water tank, buffets, pergola sheltered places, stroll ways, bicycle ways, car parking lot, basketball play grounds have been completed and garden arrangements have been made.

 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25