GENERAL INFORMATION
Client : İstanbul Greater City Municipality
Location of Construction |
: |
İstanbul |
Contract Date |
: |
14.07.1992 |
Completion Date |
: |
19.11.1993 |
Contract Value |
: |
4.437.622 US $ |
CHARACTERISTIC FEATURES
The below mentioned constructions are included in this
project. Water tank with a capacity of 800 tonnes, tea
houses, amphitheatre, open parking lot for 2000 vehicles,
sand table, toilettes, enrockment with 2-6 tonnes of
stones (31.767 tonnes), arrangement works of the green
area of 160.000 m2, kronman wall aside of the enrockment,
shore line covered with 5 cm bush-hammered mosaic on
20 cm straw steeled concrete, PVC pipes of 16 ATU, automatic
irrigation system by pop-up springs, decorative illumination
system (low and high illumination), 2 decorative and
performance pools, stroll ways and recreational areas.
Main Constructions
Excavation |
: |
26.140 m3 |
MachineCompacted Filling |
: |
235.000 m3 |
Sand-Gravel Filling |
: |
7.158 m3 |
Concrete |
: |
10.780 m3 |
Concrete Canal Laying |
: |
914 m |
Reinforced Concrete Iron |
: |
166 ton |
Straw Steel |
: |
151 ton |
2-6 tonnes of Enrockment |
: |
31.767 ton |
Stabilized Filling |
: |
31.041 m3 |
Vegetal Soil |
: |
30.646 m3 |
Bevel Filling |
: |
72.000 m3 |
5 cm Bush-hammered Mosaic Pavement |
: |
26.763 m2 |
Geotextile |
: |
24.212 m2 |
Cable Canal |
: |
11.145 m |
Prefabricated Weir |
: |
1.164 m |
16 Atü PVC pipes |
: |
16.099 m |
Miscellaneous trees, vegetation etc. |
: |
14.750 number |
The total construction area is 16.000 m2 , 90.000 m2
of which is hard ground construction of 1 water tank,
buffets, pergola sheltered places, stroll ways, bicycle
ways, car parking lot, basketball play grounds have
been completed and garden arrangements have been made.
|