GENERAL INFORMATION

Client : Marmara University Rectorate

Location of Construction : İSTANBUL
Contract Date : 17.06.1986
Completion Date : 02.10.1996
Contract Value : 6.137.400 US $

CHARACTERISTIC FEATURES

Infrastructure Construction of the Marmara University, Göztepe Campus
The construction which is established by 4 no of contracts, includes; heating center construction which is to meet the whole heating need of the building, installation channels which are to provide heat to the buildings, transformer house, sewerage network of the whole campus, heat exchanger rooms, parking lots, site illumination, site arrangement works, main entrance building, guard railings of the stone embankment facing the SSK Hospital, step building for the solar energy base have been completed.

Main Work Items

Excavation : 18.000 m3
Concrete : 6.000 m3
Border : 5.400 m
Keystone : 4.000 m2
Form work : 3.000 m2
Stone wall : 350 m3
 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com