GENERAL INFORMATION
Client : Marmara University Rectorate
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
21.11.1988 |
Completion Date |
: |
31.12.1998 |
Contract Value |
: |
6.983.357 US $ |
CHARACTERISTIC FEATURES
The Central Amphitheater and the Laboratory Construction
of the Faculty of Science and Literature at the Göztepe
Campus of the Marmara University
The construction is established by 5 no of contracts.
The base of the building has been planned to be constructed
in 6 floors each in the E type. Its total closed area
is 26.000 m2. The Faculty of Science and Literature
is an educational premise with eleven lecture rooms
and laboratories.
Main Work Items
Excavation |
: |
35.000 m3 |
Concrete |
: |
10.200 m3 |
Steel |
: |
1.180 tons |
Form work |
: |
21.000 m2 |
Brick wall |
: |
25.000 m2 |
Marble flooring |
: |
3.000 m2 |
Artificial marble flooring |
: |
9.000 m2 |
Plaster |
: |
50.000 m2 |
|