GENERAL INFORMATION

Client : Marmara University Rectorate

Location of Construction : İSTANBUL
Contract Date : 21.11.1988
Completion Date : 31.12.1998
Contract Value : 6.983.357 US $

CHARACTERISTIC FEATURES

The Central Amphitheater and the Laboratory Construction of the Faculty of Science and Literature at the Göztepe Campus of the Marmara University
The construction is established by 5 no of contracts. The base of the building has been planned to be constructed in 6 floors each in the E type. Its total closed area is 26.000 m2. The Faculty of Science and Literature is an educational premise with eleven lecture rooms and laboratories.

Main Work Items

Excavation : 35.000 m3
Concrete : 10.200 m3
Steel : 1.180 tons
Form work : 21.000 m2
Brick wall : 25.000 m2
Marble flooring : 3.000 m2
Artificial marble flooring : 9.000 m2
Plaster : 50.000 m2
 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com