GENERAL INFORMATION
Client : Marmara University Rectorate
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
08.05.1985 |
Completion Date |
: |
31.12.1998 |
Contract Value |
: |
10.084.292 US $ |
CHARACTERISTIC FEATURES
Marmara University Haydarpaşa Campus Building Restoration
Construction
The construction consists of a total of 6 contracts.
The construction works of the afore mentioned edifice
with a closed area in a total of 70.000 m2. The repair
works of which have been started in the year 1985, includes
the following units.
A) In the Faculty of Medicine;
Microbiology Laboratory, Biochemistry Laboratory,
Medical Biology Laboratory, Physiology Laboratory, Cadaver
Laboratory, Multidisciplinary Laboratory, Pharmacology
Laboratory, Histology Laboratory, Electromicroscopy
Room, X-Ray Rooms, Animal Laboratories, Medical Biology
Laboratory, Bikimer Laboratory, Biophysics Laboratory,
4 lecture rooms for 200 students each, lecture rooms
for the students of the Department of Nursery and the
rooms of the faculty members.
B) In the Faculty of Law;
Rooms of the faculty members, students canteen, rooms
of the professors, places to be used by the deanery,
3 lecture rooms for 200 students each, divisions for
graduate programs, Department of Law-Philosophy , Administrative
Departments.
C) In the Faculty of Pharmaceutics ;
Laboratories of Biochemistry, Analytical Chemistry,
Pharmaceutical technology, Herbarium, Pharmaceutical
toxicology, Pharmacognosy and Pharmacology.
D) In the Department of Cinematography-Television;
Black-white TV studios, colored TV studios (excluding
the electronic parts), student classrooms, rooms of
the faculty members.
E) In the whole building;
Repair works of the roof, VIP lounge at the main entrance,
decoration and restoration of the R hall, grading of
the front elevation of the building, arrangement of
the fore-garden, repair and painting works of the garden
wall and the bricks of the front elevation, interposition
of new broilers in the boilers room, repair works of
the bunker and LPG tube depots, construction of the
transformer house, electricity central room and the
telephone centrals.
|