GENERAL INFORMATION

Client : Marmara University Rectorate

Location of Construction : İSTANBUL
Contract Date : 25.10.1991
Completion Date : 31.12.1993
Contract Value : 1.693.727 US $

HARACTERISTIC FEATURES

The Social Facilities and Dining Hall Construction of the Marmara University, Göztepe Campus
The construction which has been started in 1991, includes the two floored canteen cafeteria building (780 m2), the Social Facility Building with a ground floor+5 floors (4.000 m2), besides the construction which is afore mentioned includes the Main Dining Hall for Students with a basement, ground floor+5 floors
(5.250 m2).

Main Work Items

Excavation : 4.200 m3
Concrete : 4.800 m3
Steel : 680 tons
Form work : 13.000 m2
Brick wall :: 10.100 m2
Plaster : 21.400 m2
Floor covering : 4.600 m2
Floor covering : 11.000 m2
 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com