HAYDARPAŞA AUTOMOTIVE REPAIR FACTORY CONSTRUCTION
GENERAL INFORMATION
Client |
: |
Ministry of Defense |
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
|
Completion Date |
: |
23.07.1984 |
Contract Value |
: |
2.799.718 US $ |
CHARACTERISTIC FEATURES
The construction of factory which is established by
8 contracts, consists mainly of repair shops for heavy
and construction machinery, storage and social units.
Heavy machinery repair units
The steel structure roof has a span of 40 m. with an
asbestos fiber sandwich construction covering.
Heavy truck repair unit
The small units on both sides of the building are used
for mechanical services. The building with a roof span
of 20 m. has an overhead crane with 5 ton, and a lift
with 12 ton capacity.
Main Work Items:
Construction Area |
: |
35.000 m2 |
Excavation |
: |
55.000 m3 |
Concrete |
: |
3.500 m3 |
Reinforcing Steel |
: |
625 tons |
Steel Construction |
: |
125 tons |
Pre-fabricated Wall Elements |
: |
680 m. |
NAKKAŞTEPE AUTOMOTIVE REPAIR FACTORY CONSTRUCTION
GENERAL INFORMATION
Client |
: |
Ministry of Defense |
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
04.02.1980 |
Completion Date |
: |
02.03.1984 |
Contract Value |
: |
4.111.214 US $ |
CHARACTERISTIC FEATURES
The construction is established by 2 contracts. The
Factory with a construction area of 80.000 m2 consists
of mechanical and service workshops with 1.000 workers
capacity, storage rooms, open air-storage rooms with
steel structure sheds, dormitories, mess-hall, administration,
social substation, power generator and water storage
buildings. The Heating Center is equipped with hot water
tanks, which provide full automatic service by means
of stockers.
SOĞANLI AUTOMOTIVE REPAIR FACTORY CONSTRUCTION
GENERAL INFORMATION
Client |
: |
Ministry of Agriculture and Rural
Affairs |
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
14.11.1974 |
Completion Date |
: |
30.12.1977 |
Contract Value |
: |
596.376 US $ |
CHARACTERISTIC FEATURES
The Factory located on the Ankara-İstanbul Highway,
consists of 2x1.000 m2 repair units and 1 service unit
where all maintenance and repair of the state highway,
water, electric departments construction machines are
provided.
Main Work Items:
Excavation |
: |
40.000 m3 |
Concrete |
: |
1.250 m3 |
Reinforcing Steel |
: |
75 tons |
Steel Structure |
: |
75 tons |
|