GENERAL INFORMATION

Client : Ministry of Defense

Location of Construction : İSTANBUL
Contract Date : 13.11.1980
Completion Date : 30.05.1984
Contract Value : 15.774.985 US $

CHARACTERISTIC FEATURES

The construction is established by 3 no of contracts. 32 blocks, 170+150 flats of accommodation units, located on a construction area of 60.000 m2, are equipped with; central heating, 800 KWA power unit, laundry building, water storage tanks and a hydrophore installation. An additional water treatment unit is also constructed for the complex.

The laundry, with 210 kg/hr washing, drying and ironing capacity, also has a 20 kg/hr capacity dry cleaning unit. The heating center is equipped with hot water boilers providing full-automatic services by means of stockers. Mechanical filtration system are used for preventing air-pollution at the coal-fired center.

 
     
| Group Companies | About Us | Projects | Search | | Homepage
© Kayalar Group, 2002
© STB Design Services, 2002
Kayalar Group
Ankara Yolu 105 Evler Erenkoy 34738 Istanbul - TURKEY
Tel : +90 (216) 360 40 40 (pbx) Fax: +90 (216) 357 39 25
e-mail: info@kayalar.com