GENERAL INFORMATION
Client : Turkish Standards Institute
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
27.06.1995 |
Completion Date |
: |
04.12.1997 |
Contract Value |
: |
17.904.777 US $ |
CHARACTERISTIC FEATURES
Main Work Items :
A BlockHead Office and
Conference Hall |
: |
3.200 m2 |
B1 BlockAdministration |
: |
2.550 m2 |
B2 BlockAdministration |
: |
2.550 m2 |
B3 BlockAdministration |
: |
2.550 m2 |
C BlockTraining |
: |
2.550 m2 |
D BlockGuest House |
: |
2.550 m2 |
E BlockCafeteria and Restaurant |
: |
1.270 m2 |
F BlockMetrology Lab |
: |
2.550 m2 |
G1 BlockElectricity Lab |
: |
2.550 m2 |
G2 BlockElectricity Lab |
: |
1.750 m2 |
H BlockElectronic Lab
|
: |
2.820 m2 |
I BlockConstruction Materials
and Packaging Lab |
: |
2.480 m2 |
J1 BlockChemistry and
Environment Lab |
: |
1.750 m2 |
J2 BlockChemistry and
Environment Lab |
: |
1.750 m2 |
K1 BlockMechanical Materials
Lab |
: |
1.700 m2 |
K2 BlockMechanical Materials
Lab |
: |
1.540 m2 |
L BlockHeating Lab |
: |
1.760 m2 |
M BlockHeating Center |
: |
1.800 m2 |
N BlockTechnical Block |
: |
1.800 m2 |
O BlockEntrance |
: |
35 m2 |
Water Tank |
: |
490 m2 |
Storage Building |
: |
970 m2 |
Transformer |
: |
150 m2 |
TotalBlock Area |
: |
42.315 m2 |
Installation Canal (Box
Section) |
: |
1.400 m |
Pedestrian Way (Space
Frame Covered) |
: |
1.200 m |
Concrete Covered Vehicle
Way |
: |
(B=6.5m)1.200
m |
Concrete Covered Vehicle
Way |
: |
(B=2x6.5m)450
m |
Rain Water System |
: |
5.000 m |
Sewerage System |
: |
2.750 m |
Head Office and Conference Hall blocks are designed
with Atrioum . Atrioum is covered by structural glass
system. Conference hall is constructed with all electronics
system. Hall which includes a 6 language simultaneous
conference system, stage and lighting system, intercom
and stage control system, video projection system, also
has an acoustical conference hall with 400 person capacity.
|