GENERAL INFORMATION
Client : Ministry of Defence
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
12.12.1977 (1)-08.07.1981 (3) |
Completion Date |
: |
25.12.1978 (1)-13.02.1985 (3) |
Contract Value |
: |
2.502.312 US $ |
CHARACTERISTIC FEATURES
The Complex consists of sports, training hall, covered
olympic swimming pool, education accommodation facilities,
museum, laboratory, lecture halls and dwelling units.
The units whose contracts have been awarded separately
from 1975 onwards, have different characteristics from
the architectural and technical points of view.
Within the complex, the aviation museum construction
is established by 4 no of contracts. Building with 4
cm thick marble plate floors and suspended plaster ceiling,
special alloxial aluminum framing with dark gray glazing.
|