GENERAL INFORMATION
Client : Ministry of Defense
Location of Construction |
: |
İSTANBUL |
Contract Date |
: |
17.02.1975 - 13.12.1985 Repairment
13.02.1989 Repairment |
Completion Date |
: |
19.01.1978 - 15.05.1986 Repairment
31.12.1989 Repairment |
Contract Value |
: |
3.498.070 US $ |
CHARACTERISTIC FEATURES
The Complex consists of sports, training hall, covered
olympic swimming pool, education accommodation facilities,
museum, laboratory, lecture halls and dwelling units.
The units whose contracts have been awarded separately
from 1975 onwards, have different characteristics from
the architectural and technical points of view.
Within the complex, olympic indoor swimming pool construction
is established by 4 no of contracts. The 1.000 audience
capacity olympic indoor swimming pool is equipped with
all instrumentation provided by contemporary technology.
A Shooting Gallery is also provided under the swimming
pool which 8 tracks are 50 m in length
|